Track Quality Issues in ERP: Inspection to Disposition
Follow an inspection issue through stock hold, approved rework or scrap, quantity reconciliation and corrective-action checks, with a 50-part example.

Track quality issues by linking the observation, affected material or job, hold status, approved disposition and follow-up evidence in one traceable record. A pass/fail field is useful, but the team also needs to know which quantity is affected and who can decide its next use.
Use this workflow for incoming inspection, an in-process defect, final inspection or a customer complaint. The source record changes; the need to preserve identity and an authorised decision remains. A complaint may require tracing the dispatch back to its job and material lot before the scope is known.
Record the issue where it is found
Capture the item, specification revision, lot or serial identity where applicable, operation, event time, inspector and affected quantity. Attach the measurement, photograph or test report needed to understand the observation. Record the requirement that was not met rather than only writing “quality problem.”
ERPNext's quality-inspection documentation illustrates inspection records connected with operational documents. For incoming material, retain the purchase receipt and supplier reference. Confirm the supported links and permission rules in the system you actually use.
Separate held quantity from usable stock
Assign a visible hold status, location or other approved control so the affected material cannot be mistaken for available stock. Agree how planning, stores and dispatch see that status. Test whether the configured system prevents the relevant transaction; an inspection record alone does not prove that issue or dispatch is blocked.
| Stage | Accepted | Held / awaiting decision | Scrap | Check |
|---|---|---|---|---|
| Initial inspection | 45 | 5 | 0 | 45 + 5 = 50 |
| Approved disposition completed | 48 | 0 | 2 | 45 + 3 reworked and accepted + 2 scrapped = 50 |
In this example, three of the five held parts pass inspection after approved rework; two receive an approved scrap disposition. The final accepted quantity is 48. Do not add the three reworked parts as a new receipt while also leaving all five on hold: that would count the same material twice.
Approve disposition and retain the history
Record who may approve rework, return, scrap or another permitted disposition, and the evidence required for each. Reworked material needs the specified reinspection before release. Keep the original defect and rework reference after acceptance so a later report does not erase the first failure.
| Field | What the next team needs |
|---|---|
| Issue and scope | Unique issue ID, item, lot/job, affected quantity and requirement |
| Containment | Hold location/status, related stock or orders checked and responsible owner |
| Disposition | Approved decision, quantities, approver and linked movement/reinspection |
| Investigation | Observed evidence, possible causes and checks still required |
| Corrective action | Assigned change, owner, due date and implementation evidence |
| Effectiveness review | What will be measured, when it will be reviewed and the closure decision |
Investigate patterns without declaring a cause too early
Group defects consistently enough to compare them by operation, item, supplier lot or period. Retain the underlying measurements. A pattern on one shift or batch is a lead to investigate; it does not, by itself, establish that the shift or supplier caused the failure.
Distinguish containment from corrective action. Holding a suspect lot protects the next handoff. Changing an approved work instruction, inspection method or process control may address a verified cause. Assign an effectiveness check so closing the action means more than completing a task.
Use the scrap and rework guide for improvement work and the stock reconciliation checklist for quantity control. In an Optiwise production demo, trace one inspection hold through planning, authorised release and the final stock balance.
Questions from manufacturing teams
What should an ERP quality issue record contain?
Record the requirement, observed evidence, affected item and lot/job, quantity, hold status, disposition approval and follow-up owner. Link the inspection to the relevant receipt, production or dispatch record.
Does creating an inspection automatically block stock?
The effect depends on the configured workflow and permissions. Demonstrate the intended issue, planning and dispatch restrictions using held material before relying on them.
How do I reconcile reworked material?
Keep the original held quantity and record the approved rework outcome. Move accepted and scrapped quantities to their proper statuses without creating an additional receipt for material already counted.
Related Posts

How Sensors Help With Quality Control in Manufacturing
Explain quality-control sensors through measured property, tolerance, calibration evidence, sampling, false alerts and human disposition.
11 Jun 2026Read more →
How Can IoT Improve My Quality Control Process?
Learn how IoT improves quality control by connecting inspection data, batch traceability, machine conditions, process parameters, and corrective action.
13 May 2026Read more →
Predictive Maintenance Software: A Growing Manufacturing Tech Career
Learn why predictive maintenance software is creating manufacturing tech careers in IoT, analytics, AI, machine data, and ERP-connected operations.
3 May 2026Read more →
AI Quality Inspection vs Human Inspection
Compare AI quality inspection and human inspection in manufacturing, including accuracy, consistency, judgement, cost, speed, and the best hybrid approach.
11 Apr 2026Read more →
