Manage Plant Maintenance and Open Work
Connect machine assets, maintenance plans, spare requirements and actual completion in Optiwise. Download a printable maintenance preparation sheet.

Run maintenance in Optiwise from the identified asset to the assigned work, required spare and completion record. Keep scheduled work separate from work actually performed, so production can see what is still waiting before planning the machine’s next job.
Identify the asset before raising the work
Use the asset number, machine or line, location and the problem or scheduled task. Our asset record can hold the installation details, manuals, specifications and practical troubleshooting attachments. The maintenance request then refers to the machine the team must work on, rather than a message saying one of the presses is down.
A planned maintenance schedule produces assigned work with instructions and required tasks. An unexpected breakdown can also raise work from the shop floor. An asset QR can help identify the machine when the request is raised; the user still supplies the symptoms and context needed for the task.
Prepare the spare and the production window
Use the maintenance work preparation sheet (PDF) to capture the asset, work reference, assigned person, instructions, spare and unresolved dependency. Keep the applicable authorised machine procedure with the work. The technician follows the approved maintenance and safety instructions for the physical work.
Suppose a scheduled inspection may need a replacement filter. Match the exact spare item and unit against the asset requirement. Check its usable stock and any purchase indent before treating the work as ready. A filter with a similar description or material still under inspection is not the required available spare.
Agree the working window with production and record the responsible person. If the spare is delayed, the maintenance and production owners need a documented next decision. A note changing the planned date does not establish that the machine is fit to run.
Record what was performed and what remains
At completion, the assigned user records the tasks performed and the corresponding form, reading or attachment. Keep spare issues and unused returns connected to the work. Record unresolved findings and the authorised handback decision rather than marking the entire plan complete because one checklist line was filled.
Our maintenance record and asset history let the next person see the plan, raised action and completion separately. The same distinction applies to calibration history: an approaching date or reminder is not evidence of a completed check.
Review repeated delays with the right records
Compare the same machine’s open work, repeated symptoms, spare waits and completed actions. Where machine monitoring is connected, use the relevant signal and its timestamp as supporting context. A signal does not replace the authorised maintenance assessment or guarantee that a failure will be predicted.
Maintenance also changes production availability. MRPeasy’s production-planning manual includes workstation maintenance alongside resource planning; the maintenance window and assigned work belong in the planning discussion. Bring one maintenance request with a spare dependency to see how it connects to your factory work in Optiwise.
Related Posts

Rejected Stock Ageing From Detection to Physical Closure
Track how long rejected parts remain unresolved. Separate the disposition decision from physical closure and keep partially returned or reworked lots visible.
7 Nov 2026Read more →
Find the Bad Mould Cavity Hidden in Your Reject Total
Compare injection-moulding rejects by cavity within the same run. Use a worked sample, clear denominators and linked quality records in Optiwise.
1 Nov 2026Read more →
Release Corrugated Cartons Against the Right Test Results
Connect corrugated-carton lots to the right quality tests. See why matching GSM cannot replace missing board or box results before release in Optiwise.
31 Oct 2026Read more →
How Sensors Help With Quality Control in Manufacturing
Explain quality-control sensors through measured property, tolerance, calibration evidence, sampling, false alerts and human disposition.
11 Jun 2026Read more →