GRN and quality control: Release the right stock
Record partial receipts, inspect incoming material and separate accepted, held and rejected quantities in Optiwise before planning the next purchase or issue.

Record what arrived against the purchase order, then use the item’s quality settings to decide when it becomes usable stock. In Optiwise, receipt, inspection and stock availability stay connected.
Start with the receipt and the required inspection
A goods receipt note, or GRN, records material received from a supplier. Keep the purchase order, item, quantity, unit, supplier document and destination store together. Add the inward lot or individual stock identifiers when the material needs that level of tracking. A supplier invoice records a commercial demand for payment; it does not establish that the delivered material passed inspection.
We support inward-first receiving and direct GRN/inventory entry, according to your setup. The item’s settings distinguish enabling quality control from making it mandatory. Mandatory inspection blocks stocking until the requirement is satisfied. Optional inspection can remain in the quality queue without applying the same stock block. This choice should match the material and the factory’s receiving rules.
Work through a short delivery
Suppose a purchase order requires 100 pieces. The supplier delivers 75; inspection accepts 70 and rejects five. Record all 75 as physically arrived, with the inspection outcome attached to the receipt. The buyer still has 25 undelivered pieces to follow up and five rejected pieces requiring a return, replacement or other agreed decision.
If the factory still needs all 100, the usable shortfall is 30 pieces. It is not enough to subtract the delivery quantity and report a shortage of 25. Stores can issue the 70 accepted pieces through the permitted stock workflow; the rejected quantity needs its own destination and action. These numbers are an illustrative receipt, not a customer result.
Give each team its next action
Stores records the arrival and identifiers. Quality opens the linked request, enters the required measurements or remarks and records the outcome. Purchasing follows the missing quantity and supplier response. Production checks usable material before releasing work. Accounts can refer to the same receipt and rejection history when reviewing the supplier’s invoice.
An inspector can use a basic inspection record or a structured form. The form can capture the dimensions, grade, visible condition or certificate reference relevant to that item. A completed form and a released quantity must describe the same material; attaching a document alone does not settle an unresolved rejection.
Keep the exception visible until it is settled
When a partial receipt is accepted, retain the remaining purchase obligation until the final agreement is recorded. When material needs reinspection, keep the affected quantity and the required action visible. A second physical delivery must be recorded against the correct purchase context rather than being added to the first receipt without a history.
Use our purchase workflow with quality control and stores records to follow that chain. Book a receipt-to-inspection demo and bring one of your partial-delivery examples.
Questions about this workflow
Does every GRN need mandatory inspection?
No. The item’s configured quality requirement determines whether inspection blocks stocking. Optional inspection has a different effect.
How much is still needed after 75 arrive and 70 pass on a 100-piece order?
There are 25 undelivered pieces and five rejected pieces to resolve. If all 100 are still required, the usable gap is 30.
Can a received quantity be treated as available immediately?
Use the stock status and the configured inspection and posting steps. Physical arrival alone does not establish usable stock.
Further reading: NIST’s guide to lot acceptance and sampling.
Related Posts

Rejected Stock Ageing From Detection to Physical Closure
Track how long rejected parts remain unresolved. Separate the disposition decision from physical closure and keep partially returned or reworked lots visible.
7 Nov 2026Read more →
Find the Bad Mould Cavity Hidden in Your Reject Total
Compare injection-moulding rejects by cavity within the same run. Use a worked sample, clear denominators and linked quality records in Optiwise.
1 Nov 2026Read more →
Release Corrugated Cartons Against the Right Test Results
Connect corrugated-carton lots to the right quality tests. See why matching GSM cannot replace missing board or box results before release in Optiwise.
31 Oct 2026Read more →
How Sensors Help With Quality Control in Manufacturing
Explain quality-control sensors through measured property, tolerance, calibration evidence, sampling, false alerts and human disposition.
11 Jun 2026Read more →